Skip to main content
V-Lab

Malaysian Pacific Indus Bhd Spline ILLIQ Liquidity Analysis

Illiquidity prediction for Monday, July 27th, 2026

1 Day

3,276.08

increased by 328.31

1 Week

2,713.88

decreased by 233.89

1 Month

1,821.19

decreased by 1,126.58

Analysis last updated: Sunday, July 26, 2026 at 03:47 AM UTC

Date Range:

from

to

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Malaysian Pacific Indus Bhd ILLIQ-SMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Jun 24, 1994 to Jul 24, 2026

Model Insight

With persistence 1.000, illiquidity shocks have a half-life of 1543 trading days (~6.1 years), close to a unit root, so long-run forecasts are highly sensitive to this estimate.

μ

ILLIQ-SMEM Model

Tap to view equation

ParameterValuet-statistic
ω

const

Unconditional variance weight

1.8433
3.57***
α

ARCH

Response to squared shocks

0.2073
11.78***
β

GARCH

Volatility persistence

0.7923
45.04***
γi Spline Coefficients
K=10
γ1-0.6021
-3.12***
γ20.8928
3.43***
γ3-0.3012
-1.85*
γ40.0676
0.39
γ5-1.4653
-2.17**
γ64.1047
2.22**
γ7-4.6026
-2.18**
γ82.5105
2.13**
γ9-0.6770
-1.50
γ10-0.1661
-0.61

Persistence:

1.000

Half-life:

1543 days