V-Lab
Malaysian Pacific Indus Bhd Asymmetric ILLIQ Liquidity Analysis
High-persistence model: shocks decay very slowly, so the theoretical long-run value may not be practically meaningful
Illiquidity prediction for Monday, September 21st, 2026
1 Day
1,367.70
1 Week
1,179.76
1 Month
1,455.77
Analysis last updated: Sunday, September 20, 2026 at 01:46 AM UTC
News Impact Curve
How returns affect tomorrow's illiquidityIlliquidity Forecast
How illiquidity evolves over timeParameter Estimates
Jun 24, 1994 to Sep 18, 2026Model Insight
With persistence 1.000, illiquidity shocks have a half-life of 1386294 trading days (~5501.2 years), close to a unit root, so long-run forecasts are highly sensitive to this estimate.
ILLIQ-AMEM Model
Tap to view equation
| Param | Value | t-stat |
|---|---|---|
| ωconst | 5.0000 | 0.16 |
| αARCH | 0.1211 | 2.72*** |
| βGARCH | 0.8919 | 62.66*** |
| γleverage | -0.0261 | -0.48 |
1.000
Persistence1386294d
Half-lifeILLIQ-AMEM Model
Tap to view equation
| Parameter | Value | t-statistic |
|---|---|---|
ω const Unconditional variance weight | 5.0000 | 0.16 |
α ARCH Response to squared shocks | 0.1211 | 2.72*** |
β GARCH Volatility persistence | 0.8919 | 62.66*** |
γ leverage Additional response to negative shocks | -0.0261 | -0.48 |
Persistence:
1.000
Half-life:
1386294 days
Other Malaysian Pacific Indus Bhd Analyses
Other Asymmetric ILLIQ Analyses on International Equities