Malaysian Pacific Indus Bhd ILLIQ-MFMEM Liquidity Analysis
Illiquidity prediction for Monday, October 26th, 2026
1 Day
3,505.16
1 Week
4,721.49
1 Month
5,456.16
Analysis last updated: Sunday, October 25, 2026 at 06:59 AM UTC
News Impact Curve
How returns affect tomorrow's illiquidityIlliquidity Forecast
How illiquidity evolves over timeParameter Estimates
Jun 24, 1994 to Oct 23, 2026Model Insight
Illiquidity shocks decay with a half-life of 60 trading days, meaning a shock loses half its impact after approximately 60 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.
ILLIQ-MFMEM Model
Tap to view equation
| Param | Value | t-stat |
|---|---|---|
| mwindow | 116 | |
| αARCH | 0.2392 | 6.26*** |
| βGARCH | 0.8424 | 62.21*** |
| γleverage | -0.1862 | -3.42*** |
| λ₁tau intercept | 0.0000 | 0.01 |
| λ₂forecast adj. | 0.0135 | 0.28 |
| λ₃tau persistence | 0.9829 | 22.55*** |
0.989
Persistence60d
Half-lifeILLIQ-MFMEM Model
Tap to view equation
| Parameter | Value | t-statistic |
|---|---|---|
m window Rolling window length | 116 | |
α ARCH Response to squared shocks | 0.2392 | 6.26*** |
β GARCH Volatility persistence | 0.8424 | 62.21*** |
γ leverage Additional response to negative shocks | -0.1862 | -3.42*** |
λ₁ tau intercept Baseline long-term coefficient | 0.0000 | 0.01 |
λ₂ forecast adj. Forecast performance sensitivity | 0.0135 | 0.28 |
λ₃ tau persistence Long-term factor persistence | 0.9829 | 22.55*** |
Persistence:
0.989
Half-life:
60 days
Other Malaysian Pacific Indus Bhd Analyses
Other ILLIQ-MFMEM Analyses on International Equities