Skip to main content
V-Lab
V-Lab

Tsi Co., Ltd. ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Tuesday, October 6th, 2026

1 Day

202.01

decreased by 26.15

1 Week

219.25

decreased by 8.91

1 Month

145.17

decreased by 82.99

Analysis last updated: Saturday, October 3, 2026 at 09:30 PM UTC

Press Delete or Backspace to remove this series.
Date Range:

from

10/02/2024

to

10/02/2026

6M ·

1Y ·

2Y ·

5Y ·

All

graph of Tsi Co., Ltd. ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Oct 30, 2017 to Oct 2, 2026

Model Insight

Illiquidity shocks decay with a half-life of 4 trading days, meaning a shock loses half its impact after approximately 4 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

Shock decay: Shocks decay with a 4-day half-life
ParamValuet-stat
mwindow21
αARCH0.1968
7.09***
βGARCH0.7249
50.16***
γleverage-0.1968
-1.43
λ₁tau intercept0.2851
0.87
λ₂forecast adj.0.9993
11.33***
λ₃tau persistence0.0007
4.92***

0.823

Persistence

4d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

21
α

ARCH

Response to squared shocks

0.1968
7.09***
β

GARCH

Volatility persistence

0.7249
50.16***
γ

leverage

Additional response to negative shocks

-0.1968
-1.43
λ₁

tau intercept

Baseline long-term coefficient

0.2851
0.87
λ₂

forecast adj.

Forecast performance sensitivity

0.9993
11.33***
λ₃

tau persistence

Long-term factor persistence

0.0007
4.92***

Persistence:

0.823

Half-life:

4 days