Skip to main content
V-Lab
V-Lab

Rizhao Port Co Ltd ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Friday, September 11th, 2026

1 Day

94.33

decreased by 9.22

1 Week

95.97

decreased by 7.58

1 Month

110.22

increased by 6.67

Analysis last updated: Friday, September 11, 2026 at 06:13 PM UTC

Date Range:

from

to

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Rizhao Port Co Ltd ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Oct 17, 2006 to Sep 4, 2026

Model Insight

Illiquidity shocks decay with a half-life of 4 trading days, meaning a shock loses half its impact after approximately 4 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

Shock decay: Shocks decay with a 4-day half-life
ParamValuet-stat
mwindow21
αARCH0.1414
11.60***
βGARCH0.7604
38.70***
γleverage-0.1414
-7.86***
λ₁tau intercept4.2190
2.47**
λ₂forecast adj.0.9876
55.20***
λ₃tau persistence0.0003
32.67***

0.831

Persistence

4d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

21
α

ARCH

Response to squared shocks

0.1414
11.60***
β

GARCH

Volatility persistence

0.7604
38.70***
γ

leverage

Additional response to negative shocks

-0.1414
-7.86***
λ₁

tau intercept

Baseline long-term coefficient

4.2190
2.47**
λ₂

forecast adj.

Forecast performance sensitivity

0.9876
55.20***
λ₃

tau persistence

Long-term factor persistence

0.0003
32.67***

Persistence:

0.831

Half-life:

4 days