V-Lab
Shandong Xinneng Taishan Power Generation Co Ltd ILLIQ-MFMEM Liquidity Analysis
Illiquidity prediction for Tuesday, August 11th, 2026
1 Day
197.79
1 Week
229.18
1 Month
289.81
Analysis last updated: Tuesday, August 11, 2026 at 06:31 PM UTC
News Impact Curve
How returns affect tomorrow's illiquidityIlliquidity Forecast
How illiquidity evolves over timeParameter Estimates
May 9, 1997 to Aug 7, 2026Model Insight
Illiquidity shocks decay with a half-life of 4 trading days, meaning a shock loses half its impact after approximately 4 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.
ILLIQ-MFMEM Model
Tap to view equation
| Parameter | Value | t-statistic |
|---|---|---|
m window Rolling window length | 111 | |
α ARCH Response to squared shocks | 0.2935 | 0.02 |
β GARCH Volatility persistence | 0.7094 | 60.30*** |
γ leverage Additional response to negative shocks | -0.2935 | -0.01 |
λ₁ tau intercept Baseline long-term coefficient | 10.0000 | 0.03 |
λ₂ forecast adj. Forecast performance sensitivity | 0.0000 | 0.00 |
λ₃ tau persistence Long-term factor persistence | 0.9368 | 1.87* |
Persistence:
0.856
Half-life:
4 days
Other Shandong Xinneng Taishan Power Generation Co Ltd Analyses
Other ILLIQ-MFMEM Analyses on International Equities