Skip to main content
V-Lab

Shandong Xinneng Taishan Power Generation Co Ltd ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Tuesday, August 11th, 2026

1 Day

197.79

decreased by 39.64

1 Week

229.18

decreased by 8.25

1 Month

289.81

increased by 52.38

Analysis last updated: Tuesday, August 11, 2026 at 06:31 PM UTC

Date Range:

from

to

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Shandong Xinneng Taishan Power Generation Co Ltd ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

May 9, 1997 to Aug 7, 2026

Model Insight

Illiquidity shocks decay with a half-life of 4 trading days, meaning a shock loses half its impact after approximately 4 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

111
α

ARCH

Response to squared shocks

0.2935
0.02
β

GARCH

Volatility persistence

0.7094
60.30***
γ

leverage

Additional response to negative shocks

-0.2935
-0.01
λ₁

tau intercept

Baseline long-term coefficient

10.0000
0.03
λ₂

forecast adj.

Forecast performance sensitivity

0.0000
0.00
λ₃

tau persistence

Long-term factor persistence

0.9368
1.87*

Persistence:

0.856

Half-life:

4 days