V-Lab
Ningxia Western Venture Industrial Co Ltd ILLIQ-MFMEM Liquidity Analysis
Illiquidity prediction for Tuesday, August 11th, 2026
1 Day
582.42
1 Week
508.81
1 Month
606.17
Analysis last updated: Tuesday, August 11, 2026 at 06:25 PM UTC
News Impact Curve
How returns affect tomorrow's illiquidityIlliquidity Forecast
How illiquidity evolves over timeParameter Estimates
Jun 17, 1994 to Aug 7, 2026Model Insight
Illiquidity shocks decay with a half-life of 3 trading days, meaning a shock loses half its impact after approximately 3 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.
ILLIQ-MFMEM Model
Tap to view equation
| Parameter | Value | t-statistic |
|---|---|---|
m window Rolling window length | 66 | |
α ARCH Response to squared shocks | 0.4910 | 0.02 |
β GARCH Volatility persistence | 0.5147 | 19.52*** |
γ leverage Additional response to negative shocks | -0.4910 | -0.01 |
λ₁ tau intercept Baseline long-term coefficient | 10.0000 | 0.02 |
λ₂ forecast adj. Forecast performance sensitivity | 0.0337 | 0.02 |
λ₃ tau persistence Long-term factor persistence | 0.9470 | 1.57 |
Persistence:
0.760
Half-life:
3 days
Other Ningxia Western Venture Industrial Co Ltd Analyses
Other ILLIQ-MFMEM Analyses on International Equities