Skip to main content
V-Lab
V-Lab

Guangdong Baolihua New Energy Stock Co Ltd Spline ILLIQ Liquidity Analysis

High-persistence model: shocks decay very slowly, so the theoretical long-run value may not be practically meaningful

Illiquidity prediction for Friday, October 9th, 2026

1 Day

62.18

increased by 5.53

1 Week

62.18

increased by 5.53

1 Month

45.68

decreased by 10.97

Analysis last updated: Friday, October 9, 2026 at 08:30 PM UTC

Press Delete or Backspace to remove this series.
Date Range:

from

10/08/2024

to

10/08/2026

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Guangdong Baolihua New Energy Stock Co Ltd ILLIQ-SMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Jan 28, 1997 to Oct 8, 2026

Model Insight

With persistence 1.000, illiquidity shocks have a half-life of 231049 trading days (~916.9 years), close to a unit root, so long-run forecasts are highly sensitive to this estimate.

μ

ILLIQ-SMEM Model

Tap to view equation

High persistence: persistence 1.000, shock half-life ~231049 days
ParamValuet-stat
ωconst1.2531
0.99
αARCH0.2309
0.12
βGARCH0.7691
0.39
∑γi Spline Coefficients
K=7
γ1-0.2169
-0.04
γ2-0.1338
-0.03
γ3-1.8043
-0.06
γ49.1890
0.08
γ5-13.2979
-0.09
γ68.8171
0.10
γ7-3.0870
-0.11

1.000

Persistence

231049d

Half-life
μ

ILLIQ-SMEM Model

Tap to view equation

ParameterValuet-statistic
ω

const

Unconditional variance weight

1.2531
0.99
α

ARCH

Response to squared shocks

0.2309
0.12
β

GARCH

Volatility persistence

0.7691
0.39
∑γi Spline Coefficients
K=7
γ1-0.2169
-0.04
γ2-0.1338
-0.03
γ3-1.8043
-0.06
γ49.1890
0.08
γ5-13.2979
-0.09
γ68.8171
0.10
γ7-3.0870
-0.11

Persistence:

1.000

Half-life:

231049 days