Skip to main content
V-Lab
V-Lab

Bangladesh Building Systems Spline ILLIQ Liquidity Analysis

Illiquidity prediction for Thursday, October 1st, 2026

1 Day

6,532.14

decreased by 3,359.34

1 Week

9,005.43

decreased by 886.05

1 Month

8,752.44

decreased by 1,139.04

Analysis last updated: Thursday, October 1, 2026 at 06:14 PM UTC

Press Delete or Backspace to remove this series.
Date Range:

from

09/30/2024

to

09/30/2026

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Bangladesh Building Systems ILLIQ-SMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Oct 8, 2013 to Sep 24, 2026

Model Insight

With persistence 0.999, illiquidity shocks have a half-life of 605 trading days (~2.4 years), close to a unit root, so long-run forecasts are highly sensitive to this estimate.

μ

ILLIQ-SMEM Model

Tap to view equation

High persistence: persistence 0.999, shock half-life ~605 days
ParamValuet-stat
ωconst1.2384
4.05***
αARCH0.4184
9.00***
βGARCH0.5805
13.20***
∑γi Spline Coefficients
K=9
γ1-2.9067
-0.86
γ23.5048
0.86
γ30.0590
0.04
γ4-1.3015
-1.02
γ50.9753
0.77
γ6-2.8507
-3.14***
γ79.0271
5.32***
γ8-24.2890
-1.72*
γ949.4355
1.71*

0.999

Persistence

605d

Half-life
μ

ILLIQ-SMEM Model

Tap to view equation

ParameterValuet-statistic
ω

const

Unconditional variance weight

1.2384
4.05***
α

ARCH

Response to squared shocks

0.4184
9.00***
β

GARCH

Volatility persistence

0.5805
13.20***
∑γi Spline Coefficients
K=9
γ1-2.9067
-0.86
γ23.5048
0.86
γ30.0590
0.04
γ4-1.3015
-1.02
γ50.9753
0.77
γ6-2.8507
-3.14***
γ79.0271
5.32***
γ8-24.2890
-1.72*
γ949.4355
1.71*

Persistence:

0.999

Half-life:

605 days