V-Lab
Bangladesh Building Systems ILLIQ-MFMEM Liquidity Analysis
Illiquidity prediction for Thursday, October 1st, 2026
1 Day
3,981.20
1 Week
5,001.97
1 Month
5,219.30
Analysis last updated: Thursday, October 1, 2026 at 06:14 PM UTC
News Impact Curve
How returns affect tomorrow's illiquidityIlliquidity Forecast
How illiquidity evolves over timeParameter Estimates
Oct 8, 2013 to Sep 24, 2026Model Insight
Illiquidity shocks decay with a half-life of 3 trading days, meaning a shock loses half its impact after approximately 3 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.
ILLIQ-MFMEM Model
Tap to view equation
| Param | Value | t-stat |
|---|---|---|
| mwindow | 21 | |
| αARCH | 0.4422 | 2.43** |
| βGARCH | 0.5584 | 8.33*** |
| γleverage | -0.4422 | -1.78* |
| λ₁tau intercept | 10.0000 | 0.59 |
| λ₂forecast adj. | 0.0000 | 0.00 |
| λ₃tau persistence | 0.9859 | 89.66*** |
0.780
Persistence3d
Half-lifeILLIQ-MFMEM Model
Tap to view equation
| Parameter | Value | t-statistic |
|---|---|---|
m window Rolling window length | 21 | |
α ARCH Response to squared shocks | 0.4422 | 2.43** |
β GARCH Volatility persistence | 0.5584 | 8.33*** |
γ leverage Additional response to negative shocks | -0.4422 | -1.78* |
λ₁ tau intercept Baseline long-term coefficient | 10.0000 | 0.59 |
λ₂ forecast adj. Forecast performance sensitivity | 0.0000 | 0.00 |
λ₃ tau persistence Long-term factor persistence | 0.9859 | 89.66*** |
Persistence:
0.780
Half-life:
3 days
Other Bangladesh Building Systems Analyses
Other ILLIQ-MFMEM Analyses on International Equities