Mount Everest Gold Group Co Ltd Spline ILLIQ Liquidity Analysis
Illiquidity prediction for Thursday, October 29th, 2026
1 Day
17,010.96
increased by 13,209.94
1 Week
6,279.34
increased by 2,478.32
1 Month
4,278.70
increased by 477.68
Analysis last updated: Thursday, October 29, 2026 at 09:56 PM UTC
Press Delete or Backspace to remove this series.
News Impact Curve
How returns affect tomorrow's illiquidityIlliquidity Forecast
How illiquidity evolves over timeParameter Estimates
Mar 13, 2018 to Oct 23, 2026Model Insight
With persistence 0.998, illiquidity shocks have a half-life of 385 trading days (~1.5 years), close to a unit root, so long-run forecasts are highly sensitive to this estimate.
μ
ILLIQ-SMEM Model
Tap to view equation
High persistence: persistence 0.998, shock half-life ~385 days
| Param | Value | t-stat |
|---|---|---|
| ωconst | 0.7142 | 3.25*** |
| αARCH | 0.2766 | 5.87*** |
| βGARCH | 0.7217 | 15.45*** |
Spline Coefficients
K=5
| γ1 | 0.7558 | 1.30 |
| γ2 | -2.6942 | -2.72*** |
| γ3 | 4.7982 | 5.28*** |
| γ4 | -7.0736 | -9.35*** |
| γ5 | 8.4402 | 11.18*** |
0.998
Persistence385d
Half-lifeμ
ILLIQ-SMEM Model
Tap to view equation
| Parameter | Value | t-statistic |
|---|---|---|
ω const Unconditional variance weight | 0.7142 | 3.25*** |
α ARCH Response to squared shocks | 0.2766 | 5.87*** |
β GARCH Volatility persistence | 0.7217 | 15.45*** |
Spline Coefficients
K=5
| γ1 | 0.7558 | 1.30 |
| γ2 | -2.6942 | -2.72*** |
| γ3 | 4.7982 | 5.28*** |
| γ4 | -7.0736 | -9.35*** |
| γ5 | 8.4402 | 11.18*** |
Persistence:
0.998
Half-life:
385 days
Other Mount Everest Gold Group Co Ltd Analyses
Other Spline ILLIQ Analyses on International Equities