Future Generation Australia Ltd Spline ILLIQ Liquidity Analysis
Illiquidity prediction for Monday, October 26th, 2026
1 Day
23,219.79
increased by 2,648.82
1 Week
21,297.81
increased by 726.84
1 Month
30,331.08
increased by 9,760.11
Analysis last updated: Sunday, October 25, 2026 at 12:45 AM UTC
Press Delete or Backspace to remove this series.
News Impact Curve
How returns affect tomorrow's illiquidityIlliquidity Forecast
How illiquidity evolves over timeParameter Estimates
Mar 6, 1997 to Oct 23, 2026Model Insight
With persistence 0.997, illiquidity shocks have a half-life of 227 trading days (~0.9 years), close to a unit root, so long-run forecasts are highly sensitive to this estimate.
μ
ILLIQ-SMEM Model
Tap to view equation
High persistence: persistence 0.997, shock half-life ~227 days
| Param | Value | t-stat |
|---|---|---|
| ωconst | 0.7407 | 1.78* |
| αARCH | 0.1302 | 17.56*** |
| βGARCH | 0.8667 | 103.18*** |
Spline Coefficients
K=3
| γ1 | -0.0113 | -0.83 |
| γ2 | 0.0552 | 2.05** |
| γ3 | -0.0971 | -3.46*** |
0.997
Persistence227d
Half-lifeμ
ILLIQ-SMEM Model
Tap to view equation
| Parameter | Value | t-statistic |
|---|---|---|
ω const Unconditional variance weight | 0.7407 | 1.78* |
α ARCH Response to squared shocks | 0.1302 | 17.56*** |
β GARCH Volatility persistence | 0.8667 | 103.18*** |
Spline Coefficients
K=3
| γ1 | -0.0113 | -0.83 |
| γ2 | 0.0552 | 2.05** |
| γ3 | -0.0971 | -3.46*** |
Persistence:
0.997
Half-life:
227 days
Other Future Generation Australia Ltd Analyses
Other Spline ILLIQ Analyses on Closed-end Funds