Skip to main content
V-Lab

Chongqing Construction Engineering Group Corporation Limited Zero Slope Spline-GARCH Volatility Analysis
Volatility Prediction for Friday, February 6th, 2026:40.15% (-1.11%)
Analysis last updated: Friday, February 6, 2026 at 08:05 PM UTC
Date Range:

from

to

6M ·

1Y ·

2Y ·

5Y ·

All

graph of Chongqing Construction Engineering Group Corporation Limited S0GARCH
paramt-stat
ω1.76272.92
α0.17645.08
β0.702014.67
γ10.71310.71
γ2-0.9466-0.67
γ3-0.1119-0.12
γ41.80771.95
γ5-3.3364-3.33
γ63.46183.60
γ7-2.0610-2.67
γ80.30040.55
Estimation Period:
Feb 21, 2017 to Jan 30, 2026
Impact of return on volatility tomorrow
Volatility Forecasts