Shanghai Hyp-Arch Architectural Design Consultant Co Ltd Zero Slope Spline-GARCH Volatility Analysis
Volatility Prediction for Monday, February 9th, 2026:26.65% (-1.02%)
Parameter Estimates
| param | t-stat | |
|---|---|---|
| 1.5946 | 1.64 | |
| 0.4075 | 2.96 | |
| 0.4895 | 5.11 | |
| 17.9444 | 1.87 | |
| -35.0828 | -2.23 | |
| 30.8128 | 2.32 | |
| -21.1151 | -2.03 | |
| 17.9833 | 1.72 | |
| -20.2869 | -1.68 | |
| 13.1039 | 1.41 | |
| -3.0034 | -0.44 | |
| -7.6475 | -0.90 | |
| 12.9747 | 1.83 |
Estimation Period:
Jul 28, 2021 to Feb 6, 2026
Jul 28, 2021 to Feb 6, 2026
News Impact Curve
Volatility Forecasts
Other Shanghai Hyp-Arch Architectural Design Consultant Co Ltd Analyses
Other Zero Slope Spline-GARCH Analyses on International Equities