Shinil Engineering Co Ltd Zero Slope Spline-GARCH Volatility Analysis
This asset is not actively trading
Parameter Estimates
| param | t-stat | |
|---|---|---|
| 0.7400 | 3.66 | |
| 0.2037 | 3.16 | |
| 0.7171 | 18.61 | |
| -0.0295 | -0.41 | |
| 0.1287 | 1.22 | |
| -0.2063 | -2.67 | |
| 0.0981 | 1.29 | |
| 0.0585 | 0.70 | |
| -0.0123 | -0.12 | |
| -0.0865 | -0.92 |
Estimation Period:
Jan 3, 1990 to Apr 10, 2015
Jan 3, 1990 to Apr 10, 2015
News Impact Curve
Volatility Forecasts
Other Shinil Engineering Co Ltd Analyses
Other Zero Slope Spline-GARCH Analyses on International Equities