Dongyang Engineering & Construction Corp Zero Slope Spline-GARCH Volatility Analysis
This asset is not actively trading
Parameter Estimates
| param | t-stat | |
|---|---|---|
| 0.5085 | 4.27 | |
| 0.0830 | 6.69 | |
| 0.8936 | 47.52 | |
| -0.0805 | -0.60 | |
| 0.0928 | 0.47 | |
| 0.0446 | 0.34 | |
| -0.2358 | -1.34 | |
| 0.2805 | 1.08 | |
| -0.0595 | -0.22 | |
| -0.2592 | -1.21 | |
| 0.7696 | 2.64 | |
| -0.9212 | -3.00 |
Estimation Period:
Jan 3, 1990 to Apr 24, 2014
Jan 3, 1990 to Apr 24, 2014
News Impact Curve
Volatility Forecasts
Other Dongyang Engineering & Construction Corp Analyses
Other Zero Slope Spline-GARCH Analyses on International Equities