Turkiye Sise ve Cam Fabrikalari AS ILLIQ-MFMEM Liquidity Analysis
Illiquidity prediction for Friday, November 27th, 2026
1 Day
21.00
1 Week
18.11
1 Month
18.16
Analysis last updated: Friday, November 27, 2026 at 10:11 PM UTC
Date Range:
from
to
News Impact Curve
How returns affect tomorrow's illiquidityIlliquidity Forecast
How illiquidity evolves over timeParameter Estimates
Jan 11, 1994 to Nov 20, 2026Model Insight
Illiquidity shocks decay with a half-life of 8 trading days, meaning a shock loses half its impact after approximately 8 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.
ILLIQ-MFMEM Model
Tap to view equation
| Param | Value | t-stat |
|---|---|---|
| mwindow | 81 | |
| αARCH | 0.1351 | 13.08*** |
| βGARCH | 0.8532 | 83.66*** |
| γleverage | -0.1351 | -8.20*** |
| λ₁tau intercept | 0.0075 | 1.11 |
| λ₂forecast adj. | 0.0495 | 8.10*** |
| λ₃tau persistence | 0.9459 | 139.47*** |
0.921
Persistence8d
Half-lifeILLIQ-MFMEM Model
Tap to view equation
| Parameter | Value | t-statistic |
|---|---|---|
m window Rolling window length | 81 | |
α ARCH Response to squared shocks | 0.1351 | 13.08*** |
β GARCH Volatility persistence | 0.8532 | 83.66*** |
γ leverage Additional response to negative shocks | -0.1351 | -8.20*** |
λ₁ tau intercept Baseline long-term coefficient | 0.0075 | 1.11 |
λ₂ forecast adj. Forecast performance sensitivity | 0.0495 | 8.10*** |
λ₃ tau persistence Long-term factor persistence | 0.9459 | 139.47*** |
Persistence:
0.921
Half-life:
8 days
Other Turkiye Sise ve Cam Fabrikalari AS Analyses
Other ILLIQ-MFMEM Analyses on International Equities