Skip to main content
V-Lab

Manba Finance Limited ILLIQ-MFMEM Liquidity Analysis

Liquidity prediction for Monday, July 20th, 2026

1 Day

716.24

decreased by 69.73

1 Week

798.24

increased by 12.27

1 Month

859.88

increased by 73.91

Analysis last updated: Sunday, July 19, 2026 at 12:42 AM UTC

Date Range:

from

to

6M ·

1Y ·

All

graph of Manba Finance Limited ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's liquidity

Liquidity Forecast

How liquidity evolves over time

Parameter Estimates

Sep 30, 2024 to Jul 17, 2026

Model Insight

Illiquidity shocks decay with a half-life of 6 trading days, meaning a shock loses half its impact after approximately 6 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

126
α

ARCH

Response to squared shocks

0.1458
3.82***
β

GARCH

Volatility persistence

0.8226
40.51***
γ

leverage

Additional response to negative shocks

-0.1458
-2.58***
λ₁

tau intercept

Baseline long-term coefficient

0.0000
0.00
λ₂

forecast adj.

Forecast performance sensitivity

0.0000
0.00
λ₃

tau persistence

Long-term factor persistence

0.9961
384.01***

Persistence:

0.896

Half-life:

6 days