Skip to main content
V-Lab
V-Lab

GD Power Development Co Ltd ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Monday, October 19th, 2026

1 Day

13.12

decreased by 1.06

1 Week

14.72

increased by 0.54

1 Month

16.70

increased by 2.52

Analysis last updated: Saturday, October 17, 2026 at 07:05 PM UTC

Press Delete or Backspace to remove this series.
Date Range:

from

10/16/2024

to

10/16/2026

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of GD Power Development Co Ltd ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Mar 18, 1997 to Oct 16, 2026

Model Insight

Illiquidity shocks decay with a half-life of 5 trading days, meaning a shock loses half its impact after approximately 5 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

Shock decay: Shocks decay with a 5-day half-life
ParamValuet-stat
mwindow21
αARCH0.1444
14.38***
βGARCH0.7871
45.95***
γleverage-0.1444
-4.88***
λ₁tau intercept0.0450
1.50
λ₂forecast adj.0.0866
4.04***
λ₃tau persistence0.9124
42.97***

0.859

Persistence

5d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

21
α

ARCH

Response to squared shocks

0.1444
14.38***
β

GARCH

Volatility persistence

0.7871
45.95***
γ

leverage

Additional response to negative shocks

-0.1444
-4.88***
λ₁

tau intercept

Baseline long-term coefficient

0.0450
1.50
λ₂

forecast adj.

Forecast performance sensitivity

0.0866
4.04***
λ₃

tau persistence

Long-term factor persistence

0.9124
42.97***

Persistence:

0.859

Half-life:

5 days