V-Lab
Chongqing Zhixin Industrial Co Ltd ILLIQ-MFMEM Liquidity Analysis
Illiquidity prediction for Monday, August 3rd, 2026
1 Day
427.97
1 Week
508.06
1 Month
508.67
Analysis last updated: Sunday, August 2, 2026 at 02:50 AM UTC
News Impact Curve
How returns affect tomorrow's illiquidityIlliquidity Forecast
How illiquidity evolves over timeParameter Estimates
Jan 15, 2026 to Jul 31, 2026Model Insight
Illiquidity shocks decay with a half-life of 1 trading day, meaning a shock loses half its impact after approximately 1 day. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.
ILLIQ-MFMEM Model
Tap to view equation
| Parameter | Value | t-statistic |
|---|---|---|
m window Rolling window length | 21 | |
α ARCH Response to squared shocks | 0.2105 | 0.27 |
β GARCH Volatility persistence | 0.0000 | 0.00 |
γ leverage Additional response to negative shocks | 0.5000 | 0.33 |
λ₁ tau intercept Baseline long-term coefficient | 5.0393 | 0.03 |
λ₂ forecast adj. Forecast performance sensitivity | 0.0369 | 0.07 |
λ₃ tau persistence Long-term factor persistence | 0.9632 | 0.82 |
Persistence:
0.461
Half-life:
1 days
Other Chongqing Zhixin Industrial Co Ltd Analyses
Other ILLIQ-MFMEM Analyses on International Equities