Skip to main content
V-Lab
V-Lab

Guangdong Shaoneng Group ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Thursday, October 29th, 2026

1 Day

125.08

increased by 1.62

1 Week

98.46

decreased by 25.00

1 Month

74.24

decreased by 49.22

Analysis last updated: Thursday, October 29, 2026 at 09:11 PM UTC

Press Delete or Backspace to remove this series.
Date Range:

from

10/28/2024

to

10/28/2026

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Guangdong Shaoneng Group ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Aug 30, 1996 to Oct 23, 2026

Model Insight

Illiquidity shocks decay with a half-life of 5 trading days, meaning a shock loses half its impact after approximately 5 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

Shock decay: Shocks decay with a 5-day half-life
ParamValuet-stat
mwindow26
αARCH0.2213
7.63***
βGARCH0.7380
35.36***
γleverage-0.1793
-4.47***
λ₁tau intercept9.0564
1.95*
λ₂forecast adj.0.6545
6.09***
λ₃tau persistence0.3455
7.15***

0.870

Persistence

5d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

26
α

ARCH

Response to squared shocks

0.2213
7.63***
β

GARCH

Volatility persistence

0.7380
35.36***
γ

leverage

Additional response to negative shocks

-0.1793
-4.47***
λ₁

tau intercept

Baseline long-term coefficient

9.0564
1.95*
λ₂

forecast adj.

Forecast performance sensitivity

0.6545
6.09***
λ₃

tau persistence

Long-term factor persistence

0.3455
7.15***

Persistence:

0.870

Half-life:

5 days