Skip to main content
V-Lab
V-Lab

Guangdong Shaoneng Group ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Friday, September 11th, 2026

1 Day

76.22

decreased by 3.64

1 Week

77.15

decreased by 2.71

1 Month

78.06

decreased by 1.80

Analysis last updated: Friday, September 11, 2026 at 06:35 PM UTC

Date Range:

from

to

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Guangdong Shaoneng Group ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Aug 30, 1996 to Sep 4, 2026

Model Insight

Illiquidity shocks decay with a half-life of 3 trading days, meaning a shock loses half its impact after approximately 3 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

Shock decay: Shocks decay with a 3-day half-life
ParamValuet-stat
mwindow21
αARCH0.2338
3.40***
βGARCH0.6933
10.36***
γleverage-0.2338
-2.44**
λ₁tau intercept10.0000
3.05***
λ₂forecast adj.0.8403
12.22***
λ₃tau persistence0.1597
10.92***

0.810

Persistence

3d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

21
α

ARCH

Response to squared shocks

0.2338
3.40***
β

GARCH

Volatility persistence

0.6933
10.36***
γ

leverage

Additional response to negative shocks

-0.2338
-2.44**
λ₁

tau intercept

Baseline long-term coefficient

10.0000
3.05***
λ₂

forecast adj.

Forecast performance sensitivity

0.8403
12.22***
λ₃

tau persistence

Long-term factor persistence

0.1597
10.92***

Persistence:

0.810

Half-life:

3 days