V-Lab
Vulcan Energy Resources Ltd ILLIQ-MFMEM Liquidity Analysis
Illiquidity prediction for Friday, August 14th, 2026
1 Day
5,136.62
1 Week
5,123.93
1 Month
4,559.22
Analysis last updated: Friday, August 14, 2026 at 05:54 PM UTC
News Impact Curve
How returns affect tomorrow's illiquidityIlliquidity Forecast
How illiquidity evolves over timeParameter Estimates
May 30, 2018 to Aug 7, 2026Model Insight
Illiquidity shocks decay with a half-life of 8 trading days, meaning a shock loses half its impact after approximately 8 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.
ILLIQ-MFMEM Model
Tap to view equation
| Parameter | Value | t-statistic |
|---|---|---|
m window Rolling window length | 26 | |
α ARCH Response to squared shocks | 0.1752 | 2.22** |
β GARCH Volatility persistence | 0.8273 | 241.96*** |
γ leverage Additional response to negative shocks | -0.1752 | -3.49*** |
λ₁ tau intercept Baseline long-term coefficient | 10.0000 | 3.89*** |
λ₂ forecast adj. Forecast performance sensitivity | 0.0000 | 0.01 |
λ₃ tau persistence Long-term factor persistence | 0.9471 | 76.98*** |
Persistence:
0.915
Half-life:
8 days
Other Vulcan Energy Resources Ltd Analyses
Other ILLIQ-MFMEM Analyses on International Equities