Skip to main content
V-Lab
V-Lab

Cairn Homes plc ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Wednesday, November 18th, 2026

1 Day

7,155.10

increased by 1,448.32

1 Week

5,351.89

decreased by 354.89

1 Month

4,511.55

decreased by 1,195.23

Analysis last updated: Wednesday, November 18, 2026 at 08:32 PM UTC

Press Delete or Backspace to remove this series.
Date Range:

from

11/17/2024

to

11/17/2026

6M ·

1Y ·

2Y ·

5Y ·

All

graph of Cairn Homes plc ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Jul 26, 2017 to Nov 13, 2026

Model Insight

Illiquidity shocks decay with a half-life of 17 trading days, meaning a shock loses half its impact after approximately 17 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

Shock decay: Shocks decay with a 17-day half-life
ParamValuet-stat
mwindow101
αARCH0.0859
10.17***
βGARCH0.8986
95.51***
γleverage-0.0505
-2.22**
λ₁tau intercept0.0000
0.00
λ₂forecast adj.0.0000
0.00
λ₃tau persistence0.9989
304.72***

0.959

Persistence

17d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

101
α

ARCH

Response to squared shocks

0.0859
10.17***
β

GARCH

Volatility persistence

0.8986
95.51***
γ

leverage

Additional response to negative shocks

-0.0505
-2.22**
λ₁

tau intercept

Baseline long-term coefficient

0.0000
0.00
λ₂

forecast adj.

Forecast performance sensitivity

0.0000
0.00
λ₃

tau persistence

Long-term factor persistence

0.9989
304.72***

Persistence:

0.959

Half-life:

17 days