Bondada Engineering Limited Asymmetric ILLIQ Liquidity Analysis
Liquidity Prediction for Monday, February 23rd, 2026:621.24 (38.79)
Parameter Estimates
| param | t-stat | |
|---|---|---|
| 1.7351 | 0.90 | |
| 0.0560 | 9.80 | |
| 0.9005 | 109.19 | |
| 0.0871 | 3.60 |
Estimation Period:
Aug 29, 2023 to Feb 20, 2026
Aug 29, 2023 to Feb 20, 2026
News Impact Curve
Liquidity Forecasts
Other Bondada Engineering Limited Analyses
Other Asymmetric ILLIQ Analyses on International Equities