Skip to main content
V-Lab

Access Engineering Ltd Asymmetric ILLIQ Liquidity Analysis

High-persistence model: shocks decay very slowly, so the theoretical long-run value may not be practically meaningful

Illiquidity prediction for Friday, July 24th, 2026

1 Day

1,658.20

decreased by 113.64

1 Week

1,180.66

decreased by 591.18

1 Month

789.13

decreased by 982.71

Analysis last updated: Friday, July 24, 2026 at 08:11 PM UTC

Date Range:

from

to

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Access Engineering Ltd ILLIQ-AMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Mar 27, 2012 to Jul 17, 2026

Model Insight

Estimated persistence of 1.000 is at or above 1 (non-stationary): illiquidity shocks do not decay and the long-run level is undefined, so long-horizon forecasts should be treated with caution.

Asymmetry: illiquidity responds almost entirely to negative returns

μ

ILLIQ-AMEM Model

Tap to view equation

ParameterValuet-statistic
ω

const

Unconditional variance weight

5.0000
1.27
α

ARCH

Response to squared shocks

0.0072
5.87***
β

GARCH

Volatility persistence

0.9163
242.34***
γ

leverage

Additional response to negative shocks

0.1530
11.87***

Persistence:

1.000

Half-life:

-