Skip to main content
V-Lab
V-Lab

Jinli Group Holdings Ltd ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Thursday, October 8th, 2026

1 Day

3,173.08

decreased by 460.15

1 Week

4,016.79

increased by 383.56

1 Month

5,553.07

increased by 1,919.84

Analysis last updated: Thursday, October 8, 2026 at 08:48 PM UTC

Press Delete or Backspace to remove this series.
Date Range:

from

10/07/2024

to

10/07/2026

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Jinli Group Holdings Ltd ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Nov 14, 2012 to Oct 2, 2026

Model Insight

Illiquidity shocks decay with a half-life of 13 trading days, meaning a shock loses half its impact after approximately 13 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

Shock decay: Shocks decay with a 13-day half-life
ParamValuet-stat
mwindow96
αARCH0.1285
12.94***
βGARCH0.8602
80.28***
γleverage-0.0818
-8.90***
λ₁tau intercept10.0000
2.42**
λ₂forecast adj.1.0000
35.84***
λ₃tau persistence0.0000
0.01

0.948

Persistence

13d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

96
α

ARCH

Response to squared shocks

0.1285
12.94***
β

GARCH

Volatility persistence

0.8602
80.28***
γ

leverage

Additional response to negative shocks

-0.0818
-8.90***
λ₁

tau intercept

Baseline long-term coefficient

10.0000
2.42**
λ₂

forecast adj.

Forecast performance sensitivity

1.0000
35.84***
λ₃

tau persistence

Long-term factor persistence

0.0000
0.01

Persistence:

0.948

Half-life:

13 days