Skip to main content
V-Lab
V-Lab

Caterpillar Inc ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Tuesday, September 22nd, 2026

1 Day

7.99

decreased by 0.06

1 Week

8.18

increased by 0.13

1 Month

8.03

decreased by 0.02

Analysis last updated: Monday, September 21, 2026 at 09:39 PM UTC

Date Range:

from

to

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Caterpillar Inc ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Jan 2, 1990 to Sep 18, 2026

Model Insight

Illiquidity shocks decay with a half-life of 23 trading days, meaning a shock loses half its impact after approximately 23 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

Shock decay: Shocks decay with a 23-day half-life
ParamValuet-stat
mwindow126
αARCH0.0504
14.64***
βGARCH0.9456
249.30***
γleverage-0.0504
-4.15***
λ₁tau intercept0.0019
3.17***
λ₂forecast adj.0.0000
0.00
λ₃tau persistence0.9991
253.71***

0.971

Persistence

23d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

126
α

ARCH

Response to squared shocks

0.0504
14.64***
β

GARCH

Volatility persistence

0.9456
249.30***
γ

leverage

Additional response to negative shocks

-0.0504
-4.15***
λ₁

tau intercept

Baseline long-term coefficient

0.0019
3.17***
λ₂

forecast adj.

Forecast performance sensitivity

0.0000
0.00
λ₃

tau persistence

Long-term factor persistence

0.9991
253.71***

Persistence:

0.971

Half-life:

23 days