Skip to main content
V-Lab
V-Lab

San Shing Fastech ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Thursday, October 8th, 2026

1 Day

9,131.78

increased by 5,137.37

1 Week

4,868.72

increased by 874.31

1 Month

3,411.75

decreased by 582.66

Analysis last updated: Thursday, October 8, 2026 at 08:51 PM UTC

Press Delete or Backspace to remove this series.
Date Range:

from

10/07/2024

to

10/07/2026

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of San Shing Fastech ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Sep 10, 2001 to Oct 2, 2026

Model Insight

Illiquidity shocks decay with a half-life of 55 trading days, meaning a shock loses half its impact after approximately 55 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

Shock decay: Shocks decay with a 55-day half-life
ParamValuet-stat
mwindow41
αARCH0.1855
12.57***
βGARCH0.7926
55.86***
γleverage0.0185
0.69
λ₁tau intercept10.0000
0.73
λ₂forecast adj.0.0413
2.08**
λ₃tau persistence0.9577
47.84***

0.987

Persistence

55d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

41
α

ARCH

Response to squared shocks

0.1855
12.57***
β

GARCH

Volatility persistence

0.7926
55.86***
γ

leverage

Additional response to negative shocks

0.0185
0.69
λ₁

tau intercept

Baseline long-term coefficient

10.0000
0.73
λ₂

forecast adj.

Forecast performance sensitivity

0.0413
2.08**
λ₃

tau persistence

Long-term factor persistence

0.9577
47.84***

Persistence:

0.987

Half-life:

55 days