Tianjin Cap Envmntl Protn ILLIQ-MFMEM Liquidity Analysis
Liquidity prediction for Friday, July 10th, 2026
1 Day
3,386.56
1 Week
4,164.79
1 Month
5,187.17
Analysis last updated: Friday, July 10, 2026 at 07:13 PM UTC
News Impact Curve
How returns affect tomorrow's liquidityLiquidity Forecast
How liquidity evolves over timeParameter Estimates
Jan 2, 2007 to Jul 3, 2026Model Insight
Illiquidity shocks decay with a half-life of 1 trading day, meaning a shock loses half its impact after approximately 1 day. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.
ILLIQ-MFMEM Model
Tap to view equation
| Parameter | Value | t-statistic |
|---|---|---|
m window Rolling window length | 111 | |
α ARCH Response to squared shocks | 0.3868 | 0.20 |
β GARCH Volatility persistence | 0.4305 | 4.46*** |
γ leverage Additional response to negative shocks | -0.3868 | -0.10 |
λ₁ tau intercept Baseline long-term coefficient | 10.0000 | 0.30 |
λ₂ forecast adj. Forecast performance sensitivity | 0.0719 | 0.26 |
λ₃ tau persistence Long-term factor persistence | 0.9281 | 9.55*** |
Persistence:
0.624
Half-life:
1 days
Other Tianjin Cap Envmntl Protn Analyses
Other ILLIQ-MFMEM Analyses on International Equities