Skip to main content
V-Lab
V-Lab

Sportamore AB ILLIQ-MFMEM Liquidity Analysis

Inactive

Last recorded values (Monday, May 11th, 2020):

1 Day

131,314.00

1 Week

175,667.52

1 Month

133,588.10

Analysis last updated: Wednesday, September 2, 2026 at 04:35 PM UTC

Press Delete or Backspace to remove this series.
Date Range:

from

05/08/2018

to

05/08/2020

6M ·

1Y ·

2Y ·

5Y ·

All

graph of Sportamore AB ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Oct 25, 2012 to May 8, 2020

Model Insight

Illiquidity shocks decay with a half-life of 8 trading days, meaning a shock loses half its impact after approximately 8 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

Shock decay: Shocks decay with a 8-day half-life
ParamValuet-stat
mwindow126
αARCH0.1523
7.36***
βGARCH0.8424
33.62***
γleverage-0.1523
-2.17**
λ₁tau intercept10.0000
0.46
λ₂forecast adj.0.0000
0.00
λ₃tau persistence0.9973
100.42***

0.919

Persistence

8d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

126
α

ARCH

Response to squared shocks

0.1523
7.36***
β

GARCH

Volatility persistence

0.8424
33.62***
γ

leverage

Additional response to negative shocks

-0.1523
-2.17**
λ₁

tau intercept

Baseline long-term coefficient

10.0000
0.46
λ₂

forecast adj.

Forecast performance sensitivity

0.0000
0.00
λ₃

tau persistence

Long-term factor persistence

0.9973
100.42***

Persistence:

0.919

Half-life:

8 days