Skip to main content
V-Lab
V-Lab

Ditas Bdy Yedek Parca Imalat ve Teknik AS ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Monday, September 21st, 2026

1 Day

14,014.49

increased by 11,399.37

1 Week

4,381.40

increased by 1,766.28

1 Month

2,116.53

decreased by 498.59

Analysis last updated: Sunday, September 20, 2026 at 03:43 AM UTC

Date Range:

from

to

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Ditas Bdy  Yedek Parca Imalat ve Teknik AS ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Mar 28, 1995 to Sep 18, 2026

Model Insight

Illiquidity shocks decay with a half-life of 4 trading days, meaning a shock loses half its impact after approximately 4 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

Shock decay: Shocks decay with a 4-day half-life
ParamValuet-stat
mwindow91
αARCH0.2398
9.79***
βGARCH0.7237
27.21***
γleverage-0.2398
-1.03
λ₁tau intercept6.8611
0.40
λ₂forecast adj.0.0769
0.99
λ₃tau persistence0.9208
11.31***

0.844

Persistence

4d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

91
α

ARCH

Response to squared shocks

0.2398
9.79***
β

GARCH

Volatility persistence

0.7237
27.21***
γ

leverage

Additional response to negative shocks

-0.2398
-1.03
λ₁

tau intercept

Baseline long-term coefficient

6.8611
0.40
λ₂

forecast adj.

Forecast performance sensitivity

0.0769
0.99
λ₃

tau persistence

Long-term factor persistence

0.9208
11.31***

Persistence:

0.844

Half-life:

4 days