V-Lab
Chavda Infra Limited ILLIQ-MFMEM Liquidity Analysis
Illiquidity prediction for Tuesday, September 1st, 2026
1 Day
4,872.03
1 Week
2,585.99
1 Month
2,315.44
Analysis last updated: Tuesday, September 1, 2026 at 07:19 PM UTC
News Impact Curve
How returns affect tomorrow's illiquidityIlliquidity Forecast
How illiquidity evolves over timeParameter Estimates
Sep 22, 2023 to Aug 28, 2026Model Insight
Illiquidity shocks decay with a half-life of 8 trading days, meaning a shock loses half its impact after approximately 8 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.
ILLIQ-MFMEM Model
Tap to view equation
| Parameter | Value | t-statistic |
|---|---|---|
m window Rolling window length | 21 | |
α ARCH Response to squared shocks | 0.1500 | 6.78*** |
β GARCH Volatility persistence | 0.8402 | 26.55*** |
γ leverage Additional response to negative shocks | -0.1500 | -4.59*** |
λ₁ tau intercept Baseline long-term coefficient | 10.0000 | 0.88 |
λ₂ forecast adj. Forecast performance sensitivity | 0.0068 | 0.23 |
λ₃ tau persistence Long-term factor persistence | 0.9844 | 70.34*** |
Persistence:
0.915
Half-life:
8 days
Other Chavda Infra Limited Analyses
Other ILLIQ-MFMEM Analyses on International Equities