Skip to main content
V-Lab
V-Lab

Aspen Aerogels Inc ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Monday, October 26th, 2026

1 Day

5,437.19

decreased by 544.12

1 Week

5,893.35

decreased by 87.96

1 Month

5,446.99

decreased by 534.32

Analysis last updated: Friday, October 23, 2026 at 10:56 PM UTC

Press Delete or Backspace to remove this series.
Date Range:

from

10/23/2024

to

10/23/2026

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Aspen Aerogels Inc ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Jun 13, 2014 to Oct 23, 2026

Model Insight

Illiquidity shocks decay with a half-life of 3 trading days, meaning a shock loses half its impact after approximately 3 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

Shock decay: Shocks decay with a 3-day half-life
ParamValuet-stat
mwindow31
αARCH0.1570
6.84***
βGARCH0.6840
18.76***
γleverage-0.1570
-6.69***
λ₁tau intercept10.0000
0.37
λ₂forecast adj.0.5269
6.86***
λ₃tau persistence0.4731
6.59***

0.763

Persistence

3d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

31
α

ARCH

Response to squared shocks

0.1570
6.84***
β

GARCH

Volatility persistence

0.6840
18.76***
γ

leverage

Additional response to negative shocks

-0.1570
-6.69***
λ₁

tau intercept

Baseline long-term coefficient

10.0000
0.37
λ₂

forecast adj.

Forecast performance sensitivity

0.5269
6.86***
λ₃

tau persistence

Long-term factor persistence

0.4731
6.59***

Persistence:

0.763

Half-life:

3 days