Skip to main content
V-Lab
V-Lab

Guangzhou Automobile Group Co Ltd ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Tuesday, September 15th, 2026

1 Day

23,800.22

increased by 22,957.50

1 Week

5,451.13

increased by 4,608.41

1 Month

2,062.38

increased by 1,219.66

Analysis last updated: Wednesday, September 16, 2026 at 07:05 PM UTC

Date Range:

from

to

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Guangzhou Automobile Group Co Ltd ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Aug 30, 2010 to Sep 14, 2026
Stationarity Enforced

Model Insight

With persistence 0.995, illiquidity shocks have a half-life of 138 trading days (~0.5 years), close to a unit root, so long-run forecasts are highly sensitive to this estimate. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

High persistence: persistence 0.995, shock half-life ~138 days
ParamValuet-stat
mwindow96
αARCH0.3348
2.74***
βGARCH0.7805
37.51***
γleverage-0.2405
-1.41
λ₁tau intercept0.0000
1.00
λ₂forecast adj.0.0003
5.28***
λ₃tau persistence0.0000
3.33***

0.995

Persistence

138d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

96
α

ARCH

Response to squared shocks

0.3348
2.74***
β

GARCH

Volatility persistence

0.7805
37.51***
γ

leverage

Additional response to negative shocks

-0.2405
-1.41
λ₁

tau intercept

Baseline long-term coefficient

0.0000
1.00
λ₂

forecast adj.

Forecast performance sensitivity

0.0003
5.28***
λ₃

tau persistence

Long-term factor persistence

0.0000
3.33***

Persistence:

0.995

Half-life:

138 days