Skip to main content
V-Lab
V-Lab

J.Jill, Inc. ILLIQ-MFMEM Liquidity Analysis

Illiquidity prediction for Wednesday, November 25th, 2026

1 Day

4,949.88

increased by 32.17

1 Week

5,143.71

increased by 226.00

1 Month

4,936.83

increased by 19.12

Analysis last updated: Tuesday, November 24, 2026 at 11:06 PM UTC

Press Delete or Backspace to remove this series.
Date Range:

from

11/24/2024

to

11/24/2026

graph of J.Jill, Inc. ILLIQ-MFMEM

News Impact Curve

How returns affect tomorrow's illiquidity

Illiquidity Forecast

How illiquidity evolves over time

Parameter Estimates

Mar 9, 2017 to Nov 20, 2026

Model Insight

Illiquidity shocks decay with a half-life of 6 trading days, meaning a shock loses half its impact after approximately 6 days. This multi-frequency model splits illiquidity into a fast short-run component and a slow-moving long-run level that drifts over the sample rather than a constant baseline.

μ

ILLIQ-MFMEM Model

Tap to view equation

Shock decay: Shocks decay with a 6-day half-life
ParamValuet-stat
mwindow21
αARCH0.1170
7.59***
βGARCH0.8346
35.90***
γleverage-0.1170
-5.82***
λ₁tau intercept10.0000
0.08
λ₂forecast adj.0.6094
14.53***
λ₃tau persistence0.3906
9.04***

0.893

Persistence

6d

Half-life
μ

ILLIQ-MFMEM Model

Tap to view equation

ParameterValuet-statistic
m

window

Rolling window length

21
α

ARCH

Response to squared shocks

0.1170
7.59***
β

GARCH

Volatility persistence

0.8346
35.90***
γ

leverage

Additional response to negative shocks

-0.1170
-5.82***
λ₁

tau intercept

Baseline long-term coefficient

10.0000
0.08
λ₂

forecast adj.

Forecast performance sensitivity

0.6094
14.53***
λ₃

tau persistence

Long-term factor persistence

0.3906
9.04***

Persistence:

0.893

Half-life:

6 days