C&D Holsin Engineering Consulting Co Ltd GAS-GARCH Student T Volatility Analysis
Volatility Prediction for Friday, February 13th, 2026:29.27% (+3.09%)
Parameter Estimates
| param | t-stat | |
|---|---|---|
| 7.7904 | 5.34 | |
| 0.1576 | 15.97 | |
| 0.9098 | 55.18 | |
| 3.2610 | 10.11 |
Estimation Period:
Jun 28, 2016 to Feb 6, 2026
Jun 28, 2016 to Feb 6, 2026
Other C&D Holsin Engineering Consulting Co Ltd Analyses
Other GAS-GARCH Student T Analyses on International Equities