Shaanxi Construction Engineering Group Corp Ltd GAS-GARCH Student T Volatility Analysis
Volatility Prediction for Friday, February 13th, 2026:20.57% (-1.15%)
Parameter Estimates
| param | t-stat | |
|---|---|---|
| 10.3560 | 4.27 | |
| 0.0851 | 50.09 | |
| 0.9921 | 529.68 | |
| 4.7061 | 16.44 |
Estimation Period:
Jun 22, 2000 to Feb 6, 2026
Jun 22, 2000 to Feb 6, 2026
Other Shaanxi Construction Engineering Group Corp Ltd Analyses
Other GAS-GARCH Student T Analyses on International Equities