Shinhan Engineering & Construction Co Ltd GAS-GARCH Student T Volatility Analysis
This asset is not actively trading
Parameter Estimates
| param | t-stat | |
|---|---|---|
| 27.8897 | 4.23 | |
| 0.1575 | 36.49 | |
| 0.9733 | 153.34 | |
| 3.4837 | 23.15 |
Estimation Period:
Jan 3, 1990 to Jun 26, 2020
Jan 3, 1990 to Jun 26, 2020
Other Shinhan Engineering & Construction Co Ltd Analyses
Other GAS-GARCH Student T Analyses on International Equities