Skyline Builders Group HLD Ltd Asy. Power MEM Volatility Analysis
Volatility prediction for Friday, November 20th, 2026
1 Day
260.07%
1 Week
238.22%
1 Month
200.94%
Analysis last updated: Thursday, November 19, 2026 at 10:18 PM UTC
News Impact Curve
How returns affect tomorrow's volatilityVolatility Forecast
How volatility evolves over timeParameter Estimates
Jan 23, 2025 to Nov 13, 2026Model Insight
Volatility shocks decay with a half-life of 5 trading days, meaning a shock loses half its impact after approximately 5 days. The volatility power δ = 0.82 sits below 2, so large shocks influence volatility less than quadratically, a more outlier-robust response than standard GARCH.
APMEM Model
Tap to view equation
| Param | Value | t-stat |
|---|---|---|
| ωconst | 1.0000 | 0.27 |
| αARCH | 0.2026 | 2.06** |
| βGARCH | 0.6983 | 6.66*** |
| γleverage | 0.1601 | 0.99 |
| δpower | 0.8245 | 0.60 |
0.859
Persistence5d
Half-lifeAPMEM Model
Tap to view equation
| Parameter | Value | t-statistic |
|---|---|---|
ω const Unconditional variance weight | 1.0000 | 0.27 |
α ARCH Response to squared shocks | 0.2026 | 2.06** |
β GARCH Volatility persistence | 0.6983 | 6.66*** |
γ leverage Additional response to negative shocks | 0.1601 | 0.99 |
δ power Transformation power | 0.8245 | 0.60 |
Persistence:
0.859
Half-life:
5 days
Other Skyline Builders Group HLD Ltd Analyses
Other Asy. Power MEM Analyses on Equities