Skip to main content
V-Lab
V-Lab

China Yangtze Power Co Ltd Asy. MEM Volatility Analysis

Volatility prediction for Friday, November 6th, 2026

1 Day

22.01%

increased by 2.69%

1 Week

22.12%

increased by 2.80%

1 Month

22.51%

increased by 3.19%

Analysis last updated: Friday, November 6, 2026 at 07:11 PM UTC

Press Delete or Backspace to remove this series.
Date Range:

from

11/05/2024

to

11/05/2026

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of China Yangtze Power Co Ltd AMEM

News Impact Curve

How returns affect tomorrow's volatility

Volatility Forecast

How volatility evolves over time

Parameter Estimates

Nov 18, 2003 to Nov 2, 2026

Model Insight

Volatility shocks decay with a half-life of 37 trading days, meaning a shock loses half its impact after approximately 37 days.

μ

AMEM Model

Tap to view equation

Shock decay: Shocks decay with a 37-day half-life
ParamValuet-stat
ωconst0.0453
6.16***
αARCH0.1986
9.63***
βGARCH0.7760
53.37***
γleverage0.0141
0.38

0.982

Persistence

37d

Half-life
μ

AMEM Model

Tap to view equation

ParameterValuet-statistic
ω

const

Unconditional variance weight

0.0453
6.16***
α

ARCH

Response to squared shocks

0.1986
9.63***
β

GARCH

Volatility persistence

0.7760
53.37***
γ

leverage

Additional response to negative shocks

0.0141
0.38

Persistence:

0.982

Half-life:

37 days