Skip to main content
V-Lab
V-Lab

Skyline Builders Group HLD Ltd MEM Volatility Analysis

Volatility prediction for Monday, November 16th, 2026

1 Day

277.67%

increased by 4.93%

1 Week

272.59%

decreased by 0.15%

1 Month

255.70%

decreased by 17.04%

Analysis last updated: Saturday, November 14, 2026 at 03:25 AM UTC

Press Delete or Backspace to remove this series.
Date Range:

from

11/13/2024

to

11/13/2026

6M ·

1Y ·

All

graph of Skyline Builders Group HLD Ltd MEM

News Impact Curve

How returns affect tomorrow's volatility

Volatility Forecast

How volatility evolves over time

Parameter Estimates

Jan 23, 2025 to Nov 13, 2026
Boundary Parameters

Model Insight

Volatility shocks decay with a half-life of 19 trading days, meaning a shock loses half its impact after approximately 19 days.

μ

MEM Model

Tap to view equation

Shock decay: Shocks decay with a 19-day half-life
ParamValuet-stat
ωconst5.0000
0.32
αARCH0.0763
0.98
βGARCH0.8886
11.69***

0.965

Persistence

19d

Half-life
μ

MEM Model

Tap to view equation

ParameterValuet-statistic
ω

const

Unconditional variance weight

5.0000
0.32
α

ARCH

Response to squared shocks

0.0763
0.98
β

GARCH

Volatility persistence

0.8886
11.69***

Persistence:

0.965

Half-life:

19 days