Korea Engineering Consultants Corp Zero Slope Spline-GARCH Volatility Analysis
Volatility Prediction for Friday, February 6th, 2026:28.81% (-3.09%)
Parameter Estimates
| param | t-stat | |
|---|---|---|
| 1.5742 | 4.08 | |
| 0.2713 | 4.90 | |
| 0.5295 | 8.16 | |
| -0.2392 | -0.68 | |
| 0.5287 | 0.92 | |
| -0.2464 | -0.43 | |
| 0.0320 | 0.06 | |
| -0.6559 | -1.41 | |
| 1.4052 | 3.18 | |
| -1.7511 | -5.06 | |
| 1.6293 | 6.45 | |
| -0.8942 | -4.60 |
Estimation Period:
Apr 28, 2011 to Jan 30, 2026
Apr 28, 2011 to Jan 30, 2026
News Impact Curve
Volatility Forecasts
Other Korea Engineering Consultants Corp Analyses
Other Zero Slope Spline-GARCH Analyses on International Equities