V-Lab
V-Lab

Byucksan Engineering & Construction Co Ltd Spline-GARCH Volatility Analysis
Volatility Prediction for Friday, April 25th, 2014:1006.87% (-106.11%)

Analysis last updated: Friday, January 29, 2016 at 03:47 AM UTC

Date Range:

from

to

6M ·

1Y ·

2Y ·

5Y ·

10Y ·

All

graph of Byucksan Engineering & Construction Co Ltd SGARCH
paramt-stat
ω0.39405.94
α0.15958.83
β0.729722.82
γ1-0.0568-0.56
γ2-0.0006-0.00
γ30.29232.90
γ4-0.4804-4.04
γ50.22281.61
γ60.09840.69
γ7-0.0607-0.45
γ8-0.0544-0.37
γ90.08000.38
γ100.72031.36
Estimation Period:
Jan 3, 1990 to Apr 24, 2014
Impact of return on volatility tomorrow
Volatility Forecasts